Makaleler
16
Tümü (16)
SCI-E, SSCI, AHCI (7)
SCI-E, SSCI, AHCI, ESCI (7)
Scopus (11)
TRDizin (2)
Diğer Yayınlar (3)
4. Significantly improved dominance relation for no-wait flowshop scheduling problems with uncertain setup times
Hacettepe Journal of Mathematics and Statistics
, cilt.52, sa.2, ss.487-498, 2023 (SCI-Expanded, Scopus)
5. More effective heuristics for a two-machine no-wait flowshop to minimize maximum lateness
International Journal of Industrial Engineering Computations
, cilt.13, sa.4, ss.543-556, 2022 (SCI-Expanded, Scopus)
6. A new dominance relation no-wait flowshop scheduling problems with interval setup times
International Journal of Advanced Research in Engineering Innovation
, cilt.4, sa.4, ss.58-63, 2022 (Hakemli Dergi)
8. A BETTER DOMINANCE RELATION AND HEURISTICS FOR TWO-MACHINE NO-WAIT FLOWSHOPS WITH MAXIMUM LATENESS PERFORMANCE MEASURE
Journal of Industrial and Management Optimization
, cilt.17, sa.4, ss.1973-1991, 2021 (SCI-Expanded, Scopus)
11. Minimizing makespan for flowshop scheduling problem with random and bounded processing times
International Journal of Business and Technology Management
, cilt.3, ss.49-52, 2021 (Hakemli Dergi)
13. Minimizing total completion time in a two-machine no-wait flowshop with uncertain and bounded setup times
Journal of Industrial and Management Optimization
, cilt.16, sa.5, ss.2439-2457, 2020 (SCI-Expanded, Scopus)
Hakemli Bilimsel Toplantılarda Yayımlanmış Bildiriler
20
1. Scheduling on a three-machine flowshop with uncertain processing times to minimize makespan
3rd International Virtual Conference on Education, Social Sciences and Technology, Kuala-Lumpur, Malezya, 12 Ağustos 2023, (Tam Metin Bildiri)
2. Scheduling on a three-machine flowshop with uncertain processing times to minimize makespan
12th International Conference on Computer Sciences and Computational Mathematics, İstanbul, Türkiye, 13 Temmuz 2023, (Özet Bildiri)
3. A better dominance relation for no-wait flowshop scheduling problems with bounded setup times
3rd International Multidisciplinary Conference on Education, Engineering and Social Sciences, Kuala-Lumpur, Malezya, 26 Kasım 2022, (Tam Metin Bildiri)
4. Minimizing maximum lateness for a no-wait flowshop scheduling
5th European International Conference on Industrial Engineering and Operations Management, Rome, İtalya, 26 Temmuz 2022, (Özet Bildiri)
10. Flowshop scheduling problem to minimize mean completion time with uncertain processing times
20th International Symposium on Econometrics, Operations Research and Statistics, Ankara, Türkiye, 12 Şubat 2020, (Özet Bildiri)